← Back to articlesDeployment | 2026-06-04
How to Stack and Cable a Multi-Box Phone Farm Without USB Collapse
**Layout rules**
- One powered USB 2.0 hub per box branch — avoid daisy-chaining consumer hubs
- Label each box ID on chassis and in software groups
- Keep data cables under 2 m where possible; use active extensions for long runs
**Stacking**
Metal chassis stack with airflow gaps. Heaviest boxes on lower shelf; network gear on separate shelf with UPS.
**Migration trigger**
When mirror refresh slows or Windows reports USB resource errors on 40+ nodes, plan OTG/LAN for the next box group.
**Router handoff**
Box and PC on same subnet; green LED = OTG/LAN mode. Router sizing: /products/network-equipment.
Installation reference: /manual · OTG/LAN tutorial: /blog/otg-lan-network-setup
Need a phone farm configuration?
Send device count, target model, connection mode (USB / OTG-LAN) and shipping country. Guangzhou Phone Farm replies with hardware configuration and factory quote within 24 hours.
For confirmed bulk orders, payment methods can be discussed with sales, including USDT when applicable.